Throttle Body Reassembly - Suzuki VL800 Supplementary Service Manual

Hide thumbs Also See for VL800:
Table of Contents

Advertisement

108
VL800K5 ('05-MODEL)

THROTTLE BODY REASSEMBLY

Reassemble the throttle body in the reverse order of disassem-
bly. Pay attention to the following points:
• Apply thin coat of the engine oil to the new O-rings.
#
Replace the O-rings with the new ones.
• With the STV fully opened, install the STP sensor 1 and
tighten the STP sensor mounting screw to the specified
torque.
#
TPS and STPS resemble each other very closely in
external appearance.
Make sure to check the color of coupler before install-
ing.
STP sensor: Green color coupler
TP sensor: Black color coupler
NOTE:
* Align the secondary throttle shaft end A with the groove B of
STP sensor.
* Apply SUZUKI SUPER GREASE "A" to the secondary throttle
shaft end A if necessary.
, 99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
" 09930-11950: Torx wrench
* STP sensor mounting screw: 3.5 N·m (0.35 kgf-m, 2.45 lb-ft)
NOTE:
If the STP sensor adjustment is necessary, refer to page 111 for
STP sensor setting procedure.
• With the throttle valve fully closed, install the TP sensor 2
and tighten the TP sensor mounting screw to the specified
torque.
NOTE:
* Align the throttle shaft end C with the groove D of TP sensor.
* Apply SUZUKI SUPER GREASE "A" to the throttle shaft end
C if necessary.
TP sensor setting procedure. ( $ Page 118)
, 99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
" 09930-11950: Torx wrench
* TP sensor mounting screw: 3.5 N·m (0.35 kgf-m, 2.45 lb-ft)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents