▶ Open windows and doors ▶ Call a trained and certified installer or service company. Risk of fire from soldering and welding When soldering and brazing around combustible and flammable material: ▶ Take appropriate protective measures. Logano G234X – 6 720 811 235 (2014/05)
Page 3
▶ Upon completion of the installation, these instructions should be handed to the owner and operator of the appliance. ▶ Inform the owner/operator that they must never carry out any modifications or repairs. Logano G234X – 6 720 811 235 (2014/05)
Before commissioning, read the Safety instructions in chapter 1.2 on overview of the use and operation of the boiler. page 2 for your own safety. The Logano G234X floor-standing gas boiler is generally referred to Before commissioning: below as a boiler.
▶ Inform a qualified service company. The vent pipe in the boiler must be checked for blockage and the flame baffle replaced. The flame roll-out switch is for one-time use only and may not be reused. Logano G234X – 6 720 811 235 (2014/05)
If the operating pressure has dropped as a result of bleeding the system: Table 2 Operating pressure (entered by heating contractor) ▶ Add water to the system. Once the operating pressure remains stable: ▶ Remove the hose from the drain & fill valve. Logano G234X – 6 720 811 235 (2014/05)
Your own safety is paramount. ▶ Close the main shutoff valve or gas shutoff valve. ▶ Isolate the heating system from the electrical power supply via the emergency shutoff switch or the corresponding building fuse. Logano G234X – 6 720 811 235 (2014/05)
Cleaning and care To clean the boiler: ▶ Clean the jacket with a damp cloth (soapy solution). ▶ Never use scouring or aggressive cleaning agents that would damage the painted surface or plastic components. Logano G234X – 6 720 811 235 (2014/05)