Delta SOL10.0-1TR3-E4 Operation And Installation Manual

Delta SOL10.0-1TR3-E4 Operation And Installation Manual

Delta inverter operation and installation manual
Table of Contents

Advertisement

Quick Links

Operation and Installation Manual for
SOL10.0-1TR3-E4
SOL11.0-1TR3-E4

Advertisement

Table of Contents
loading

Summary of Contents for Delta SOL10.0-1TR3-E4

  • Page 1 Operation and Installation Manual for SOL10.0-1TR3-E4 SOL11.0-1TR3-E4...
  • Page 2 Delta Energy Systems (Germany) GmbH Tscheulinstraße 21 79331 Teningen Germany © Copyright – Delta Energy Systems (Germany) GmbH – All rights reserved. This manual is included with our solar power inverter and is intended for use by the installer and end user.
  • Page 3: Table Of Contents

    Mounting Solar Power Inverter........23 Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 4 10.15 Changing Grid ..........64 Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 5 Overview of menu structure ......... . . 86 Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 6: About This Manual

    Step The solar power inverter can be safely and normally operated if The end of instructions is designated as follows: installed and used in accordance with this manual. Delta Energy þ End of instructions Systems is not responsible for damage incurred by failure to com- ply with the installation and operating instructions in this manual.
  • Page 7: Intended Purpose

    Any of the following uses of the solar power inverter is considered improper: ● Isolated operation. The solar power inverter has anti-islanding and other monitoring features. ● Use in mobile PV systems. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 8: General Safety Instructions

    ● The solar power inverter contains no components that must be maintained or repaired by the operator or installer. All repairs must be performed by Delta Energy Systems. Opening the cover will void the warranty. ● Do not disconnect any cables when the solar power inverter is powered due to risk of a fault arc.
  • Page 9: Unpacking

    "Power limit" label (e) – Solar power inverter (f) – Retaining clip ► Check all parts for signs of damage! ► Store the packaging in a safe place! ➃ ➀ ➄ ➁ ➅ ➂ Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 10: Product Description

    “5.4 Display and Buttons”, p. 12 ➁ Type Plate See Chapter “5.2 Type plate”, p. 11 ➂ Electrical Connections See Chapter “5.5 Electrical connections”, p. 16 ➃ Fans See Chapter “5.6 Fan”, p. 17 ➄ Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 11: Type Plate

    AC max. continuous output current AC max. continuous output power AC max. apparent power AC power factor AC power factor (cos φ) IP class Degree of protection Safety class Protection rating Ambient temperature/derating Ambient temperature/derating Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 12: Status Leds

    The fi rst row contains the name and number of the currently dis- played menu. The second to fourth rows show the menu elements. A small arrow in the third row shows the currently selected menu item. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 13: Go To Menu" Function

    U S B f e a t u r e s P r o d u c t i o n i n f o ➔ U s e r s e t t i n g s Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 14: Setting Values

    1 4 : 2 6 : 5 1 1 4 : 2 6 : 5 1 1 4 : 2 6 : 5 1 1 4 : 2 6 : 5 1 Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 15 1 4 : 2 6 : 5 1 1 4 : 2 6 : 5 1 1 4 : 2 6 : 5 1 1 4 : 2 6 : 5 1 Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 16: Electrical Connections

    2 x RS485 interfaces “5.5.4 RS485 interface (EIA485)”, p. 17 ➃ USB Interface “5.5.5 USB interface”, p. 17 ➄ Not used ➅ DC Isolating Switch “5.5.2 DC connections and DC isolating switch”, p. 17 ➆ Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 17: Dc Connections And Dc Isolating Switch

    Monitoring systems require the ID to recognize each solar power inverter in a PV system. The last solar power inverter must have an RS485 termina- tion resistor connected, which can be ordered from Delta (see “16 Appendix”, p. 85). The ID can be configured during commissioning (see “8 Commis-...
  • Page 18: Operating Behavior

    MPP tracker is activated. using a USB drive. This above all makes switching solar power inverters easier. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 19: Characteristic Curves

    The event log is primarily intended for the installer and should make analyzing and resolving problems easier. The internal log helps Delta Solar Support when analyzing more difficult problems. Reports The reports combine the various information on production, events, settings, parameter changes and errors.
  • Page 20: Installation

    Use dowels and screws for the installation that are suitable for the wall material and the heavy weight. ► Mount the solar power inverter vertically, see Fig. 7.1, p. 20. ✓ Fig. 7.1: Mounting alignment Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 21: Ambient Conditions

    >10 cm Fig. 7.2: Mounting clearances for correct convection ► Avoid heavy soiling. Dust can impair the performance of the device. ► Protect the solar power inverter from heavy rain and snow deposits. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 22: Attaching The Solar Power Inverter

    Screws (Ø6 mm) + dowels for attaching the mounting plate to the wall. At least four screws are required. ▪ Drill and drill bits suitable for the wall material and size of the dowels. Screwdriver or wrench fitting the screws. ▪ Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 23: Mounting Solar Power Inverter

    300-mA residual current device (type A). However, <GT>22Check the Installation. be sure to always adhere to the specifi c regulations applicable in þ Physical installation of the solar power inverter is now com- your country. plete. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 24: Required Tools And Accessories

    (e.g., automatic circuit breaker and/or overvolt- age protection devices). 52,5 mm (PE: 57,5 mm) A special kit for France is available from Delta. This kit contains all 10 mm components required to meet the requirements specified in UTE C15-712-1 (“16.1 Order numbers”, p.
  • Page 25 Check the installation. ➁ ➀ þ The grid connection has been established. ► Fit a cable strain-relief clamp directly behind the round plug when using cables of diameters between 11 and 13 mm. We Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 26: Connecting The Pv Modules

    General Instructions The strings of the PV modules are connected to the DC connec- tions, see Fig. 7.5, p. The grounding kit can be ordered from Delta. A manual is included and can be downloaded under www.solar-inverter.com/eu/de/ grounding-kit.htm. Grounding kit...
  • Page 27: Establishing Connection

    Install the connection plug/socket on the DC cable. Follow the connection plug manual when doing this. Insert the DC cable into the DC connections for the solar power inverter. Check the installation. þ The PV module is now connected. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 28: Connect Rs485 (Eia485) - Optional

    The RS485 ID and RS485 termination resistor can be set during den, www.harting.com) commissioning (see “8 Commissioning”, p. 30) and during ongo- ing operation (see “10.6 RS485 (EIA485) Settings”, p. 54). Pin Assignments Assignment Reserved Reserved Reserved Reserved Reserved TX_A RX_B Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 29: Connecting Individual Solar Power Inverters

    RS485 RS485 RS485 Cable 308116x00 Cable 308116x00 Cover unused For cable specification, connections. contact Delta Support. Data logger Fig. 7.9: Connection of multiple solar power inverters to a data logger via RS485 Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 30: Commissioning

    8. Commissioning Commissioning Before You Begin The solar power inverter must be correctly installed, see “7 Installa- tion”, p. 20. Information on operating the display is provided in “5.4 Display and Buttons”, p. 12. nOTE As long as the commissioning procedure has not been completed, you can go back to any point in the commissioning procedure at any time by pressing the...
  • Page 31: Selecting The Correct Commissioning Procedure

    The solar power inverter should be newly set up and the grid to which the solar power You can set up a customer-specific grid. inverter is connected is not shown in the list above. Please contact Delta Support by phone. Operation and Installation Manual for SOLIVIA 10.0 / 11.0 EU G4 TR...
  • Page 32: Commissioning For Grids As Per En 50438 And Vde 0126

    8. Commissioning Commissioning for grids as per En 50438 and VDE 0126 This commissioning applies to the following countries and grids: Country Grid notes BE C10/11 12 Belgium Synergrid C10/11 2012 Bulgaria VDE 0126-1-1 FR ISL. 60Hz France French Islands 60 Hz FR UTE UTE 15 712-1 FR VFR 2013...
  • Page 33 8. Commissioning - - - - - - - - - - - - - - - - - - - G r i d s e l e c t i o n Press the buttons to select continue and then press the button.
  • Page 34 8. Commissioning I D : B a u d r a t e : R S 4 8 5 1 9 2 0 0 15. Press the buttons to select continue and then press the button. T e r m i n a t i o n : c o n t i n u e ➔...
  • Page 35: Commissioning For Vde Ar N 4105 Grids

    8. Commissioning Commissioning for VDE AR n 4105 grids Commissioning as per VDE AR N 4105 applies for the following countries and grids: Country Grid notes DK LVD Denmark VDE AR N 4105 DE LVD Germany VDE AR N 4105 Check all connections and cables for damage and correct seating.
  • Page 36 8. Commissioning - - - - - - - - - - - - - - - - - - - P D D s e t t i n g s Press the buttons to select continue and then press the button.
  • Page 37 8. Commissioning nOTE: If multiple solar power invert- R S 4 8 5 18. To change the value, press the button and then set ers are to be connected via RS485, the value using the buttons. Press the button to - - - - - - - - - - - - - - - - - - - select a different ID for each inverter.
  • Page 38: Commissioning For Grids As Per Bdew

    8. Commissioning Commissioning for grids as per BDEW Commissioning as per BDEW is valid for the following countries and grids: Country Grid notes DE MVD Germany BDEW Check all connections and cables for damage and correct seating. Correct the installation if necessary. Switch on the DC isolating switch.
  • Page 39 8. Commissioning nOTE: Steps 10 and 11 are only P D D s e t t i n g s 10. To change the value, press the button and then set necessary when the mode User was the value using the buttons.
  • Page 40 8. Commissioning - - - - - - - - - - - - - - - - - - - D a t e : D a t e a n d t i m e 2 5 . 0 5 . 2 0 1 2 17.
  • Page 41: Commissioning By Loading The Settings From Another Solar Power Inverter

    8. Commissioning Commissioning by loading the settings from another solar power inverter It is possible in all countries and for all grids to load the settings from another solar power inverter. ATTEnTIOn The IP 65 degree of protection is no longer guaranteed when the USB interface protective cover is removed. ►...
  • Page 42 8. Commissioning nOTE: If the message Pendrive S e l e c t R S 4 8 5 I D Press the buttons to select the ID and then press error is displayed, make sure the button. USB drive is properly inserted or that I D : ➔...
  • Page 43 8. Commissioning I D : B a u d r a t e : R S 4 8 5 1 9 2 0 0 16. Press the buttons to select continue and then press the button. T e r m i n a t i o n : c o n t i n u e ➔...
  • Page 44: Commissioning After Replacing A Solar Power Inverter

    In this chapter, the term "swap" means the replacement of a damaged solar power inverter with a new device of the same type. The replacement may only be performed after consulting Delta Solar Support. The support team will discuss the correct procedure with you.
  • Page 45 8. Commissioning nOTE: If the message No fi les - - - - - - - - - - - - - - - - - - - L o a d U S B d a t a Press the buttons to select Load Swap Data and found is displayed, make sure the then press the...
  • Page 46 8. Commissioning nOTE: If multiple solar power invert- R S 4 8 5 15. To change the value, press the button and then set ers are to be connected via RS485, the value using the buttons. Press the button to - - - - - - - - - - - - - - - - - - - select a different ID for each inverter.
  • Page 47: Production Information

    480 Event Journal List of operating state messages “12.4.1 “External events” log”, p. 78 490 History Statistics for the last seven days “9.3 Other statistics”, p. 50 the solar power inverter was in operation. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 48: Actual Data

    L 1 F r e q . : _ _ _ H z phase L1 L1 Q Currently fed reactive power for phase L1 Current DC electricity component L1 DC inj. of AC current for phase L1 Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 49 R iso- Current insulation resistance for R i s o + : _ _ _ _ k Ω DC– (DC MINUS) R i s o - : _ _ _ _ k Ω Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 50: Other Statistics

    _ _ _ _ k Ω 443 Month stat. ISO the selected period R i s o m i n : _ _ _ _ k Ω 453 Year stat. ISO 463 Total stat. ISO Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 51: Reset Statistics

    R e s e t d a y s t a t . S u c c e s s f u l P r e s s E N T E R Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 52: Settings

    Display Text Designation Description Language Language The display language. Czech | Danish | Dutch | English | French | German | Italian | Por- tuguese | Romanian | Slovak | Slovenian | Spanish Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 53: Date And Time

    Freely confi gurable according to the selected time format Confi gurable Parameters Display Text Designation Description Date Date format DD.MM.YYYY DD/MM/YYYY DD-MM-YYYY MM.DD.YYYY MM/DD/YYYY MM-DD-YYYY YYYY.MM.DD YYYY/MM/DD YYYY-MM-DD Time format 12h | 24h Time Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 54: Backlighting, Contrast

    (see “7.5 Connect RS485 (EIA485) - op- tional”, p. 28). ► This termination resistor can be ordered from Delta, see “16 Appendix”, p. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 55: Currency And Credit Per Kwh

    Day statistics Week stats Week statistics Month stats Month statistics Year stats Year statistics Total stats Total statistics History History Statistics for the last seven days the solar power inverter was in operation. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 56: Active Power Control

    - - - - - - - - - - - - - - - - - - - Confi gurable Parameters Display Text Designation Description Maximum active Limits the active power to Max power power the set value. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 57: Active Power By Frequency P(F)

    , the active Stop power feed is stopped. Active power feed will resume once the grid frequency falls below . Once resumed, the active power will increase by 10% per Start minute. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 58: Reactive Power Control

    (50 ... 99 %) Power ratio point A = 0 % Power ratio point D = 100 % (cannot be changed) (cannot be changed) Fig. 10.3: Setting Ranges for "cos φ (P)" Function Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 59 Fig. 10.5: Effect of active power limitation on the "cos (P)" function This active power reduction to 8 kW means point D can never be achieved. This applies for the entire grey area. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 60: Constant Power Factor Cos Φ

    Defi nes cos φ to be the set Q/Sn Ratio Q/S Relationship of reactive value. power with rated apparent inductive | capacitive power. 1 ... 0.8 inductive | capacitive -60 ... +60 % Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 61: Q (U)

    Select the individual param- eters with the buttons. Press the button to change the value. Confi gurable Parameters Display Text Designation Description Low Q/Sn Lower limit Q/S 0 ... 60 % Capacitive Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 62: Fault Ride-Through (Frt)

    0 ... 100 % Low shadowing, Max I asym. Maximum power Maximum reactive current time cycle: 4.5 hours asymmetrical in the case of an asymmet- ric failure (= 2 phases) 0 ... 100 % Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 63: Insulation And Grounding Monitoring

    ISO Error ISO Warning Confi gurable Parameters – GND Error – GND Warning Display Text Designation Description + GND Error Menu number Menu number Any valid menu number. + GND Warning ISO/GND off Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 64: Changing Grid

    PIN. Each time you wish to select a new grid or change the protected settings for the current grid, you will need a new PIN. You can obtain this PIN from Delta Support. Procedure for changing the grid Main Menu >...
  • Page 65: Saving And Loading Data And Settings

    USB drive. Since the RS485 ID for both power inverters is the same, the file name is also the same. The file from the first power inverter is then overwritten. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 66: Enabling/Disabling The Usb Interface

    S t a t e : e n a b l e d ➔ → The USB interface is now enabled/disabled. M o n i t o r i n g : O f f Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 67: Updating Firmware

    Once DC voltage has been applied for at least 10 error is displayed, make sure the minutes, the fi rmware is updated. USB drive is properly inserted. Disable the USB interface (see „11.3 Enabling/disabling the USB interface“, p. 66). Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 68: Saving Settings

    S u c c e s s f u l P r e s s E N T E R Disable the USB interface (see „11.3 Enabling/disabling the USB interface“, p. 66). Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 69: Loading Settings

    S u c c e s s f u l P r e s s E N T E R Disable the USB interface (see „11.3 Enabling/disabling the USB interface“, p. 66). Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 70: Saving Swap Data

    S u c c e s s f u l P r e s s E N T E R Disable the USB interface (see „11.3 Enabling/disabling the USB interface“, p. 66). Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 71: Creating Reports

    Disable the USB interface (see „11.3 Enabling/disabling the USB interface“, p. 66). 11.9 Service This function is used for servicing purposes. You will be contacted by the Delta Support Team when this function must be used. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 72: Diagnostics And Troubleshooting

    For problems with the insulation or grounding, you can use the 230 Grounding menu to defi ne whether a warning is given or a failure is triggered (see Chapter “10.13 Insulation and grounding monitor- ing”, p. 63). Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 73: Status Display Of The Leds

    Insulation or grounding warning during normal operation Insulation or grounding warning during syn- chronization Insulation or grounding warning simultane- ously with other failure Insulation or grounding warning simultane- ously with other warning Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 74: Messages On Display

    For an insulation failure, the red e arth Operation LED is solid. The feed to the ault grid is stopped. Earth Fault Failure Table 12.3: Display of message categories on the LEDs and display Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 75: Analyzing Failures

    Events in the "external events" failure category are generally resolved by the installer. Events in the "internal events" failure category must always be dis- cussed with Delta Solar Support fi rst before attempting to resolve the failure. If events from both categories occur simultaneously, those in the "internal events"...
  • Page 76: Procedure For Internal Events

    Insuffi cient solar irradiation (dawn/dusk). ► Check the PV cell voltage shown on the display (416 Current Data PV menu). Auto test failure Failure during Italian autotest. For Italy only. ► Repeat the autotest. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 77 The internal temperature of the solar power inverter is between 55 and 70° C. ► Check the ventilation of the solar power inverter. ► Prevent direct sunlight from reaching the solar power inverter. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 78: Logging The Messages

    External events Description Internal events are problems within the solar power inverter. Inter- ● Internal events nal events should be resolved by Delta Solar Support. ● Log as per VDE AR N 4105 Accessing the Menu ● Log as per BDEW Main menu >...
  • Page 79: Log For Bdew

    Date and time when the event occurred. 2. Line Date and time when the event occurred. 3. and Other Lines Brief description of the failure(s) 3. and Other Lines Brief description of the failure(s) Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 80: Change Events" Log

    Source of the change: D: Display E: External (RS485) U: USB Interface S: System 3. Line Name of the changed parameter and previous value 4. Line Name of the changed parameter and new value Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 81: Maintenance And Repair

    Unplug the fan plug ➀ Pull out the four fan retainers ➂ Remove the fan ➁ Fit the new fan ➁ Press in the four fan retainers ➂ Plug in the fan plug ➀ Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 82: Decommissioning, Transport, Storage, Disposal

    Observe the specifications relating to storage conditions described in Chapter “15 Technical data”, 14.5 Disposal Dispose of the solar power inverter in an appropriate manner according to the legal requirements of your country. Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 83: Technical Data

    (July 2012) RD 1663/2000; Synergrid C10/11 (July 2012); EN 50438; G59/1-2; VDE-AR-N 4105; BDEW EN61000-6-2, EN61000-6-3, EN61000-6-2, EN61000-6-3, EN61000-3-11, EN61000-3-12 EN61000-3-11, EN61000-3-12 Safety IEC62103, IEC62109-1/-2 IEC62103, IEC62109-1/-2 IP65 for electronics/IP54 for cooling area Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 84 -25 ... +55 °C Storage temperature range -25 ... +80 °C -25 ... +80 °C Humidity 0 ... 95% 0 ... 95% Max. operating height 2,000 m above sea level 2,000 m above sea level Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4...
  • Page 85: Appendix

    Grounding kit The ground connection must be installed near the solar power inverter. We recommend using the "Grounding Set A Solar" grounding kit from Delta. Grounding kit Delta Part number Grounding Set A Solar EOE990000275 Cable couplings Cable coupling types for the DC connections to the inverter. The DC+ connection of the solar power inverter is a plug, the DC– connection is a socket.
  • Page 86: Overview Of Menu Structure

    16. Appendix 16.2 Overview of menu structure nOTE You can use the "Go to Menu" function to directly navigate to a particular menu. To open the Go to Menu function, press the button for at least three seconds. → Go to menu opens. G o t o m e n u M e n u : 4 1 1...
  • Page 87 16. Appendix Main Menu 100 Install Settings 100 Install Settings 200 Options Language: German Date and Time 300 USB features 110 Date and time Display settings 400 Production Info Date Grid selection 500 User Settings Time RS485 600 Diagnostic&Alarm Format 111 Format 700 Inverter Info Date...
  • Page 88 16. Appendix 400 Production Info 410 Current Data 410 Current Data 420 Day Statistics Current Overview 411 Current Overview 430 Week Statistics Current Data AC 440 Month Statistics Current Data L1 450 Year Statistics Current Data L2 Curr. operating state 460 Total Statistics Current Data L3 470 Feed-In Settings...
  • Page 90 SERVICE - EUROPE Belgium Austria support.belgium@solar-inverter.com service.oesterreich@solar-inverter.com 0800 711 35 (Free Call) 0800 291 512 (Free Call) Bulgaria Portugal support.bulgaria@solar-inverter.com suporte.portugal@solar-inverter.com +421 42 4661 333 +49 7641 455 549 Denmark Switzerland support.danmark@solar-inverter.com support.switzerland@solar-inverter.com 8025 0986 (Free Call) 0800 838 173 (Free Call) Germany Slovakia service.deutschland@solar-inverter.com...

This manual is also suitable for:

Sol11.0-1tr3-e4

Table of Contents