Lenovo ThinkCentre M83 Hardware Maintenance Manual page 135

Machine types: 10a0, 10a1, 10a2, 10a3, 10a4, 10a5, 10a6, 10a7, 10a8, 10a9, 10aa, 10ab, 10be, 10ag,10ah, 10aj, 10ak, 10al,10am, 10an, 10df, 10dg, 10dh, 10dj, 10e8, 10e9, 10ea, and 10eb
Hide thumbs Also See for ThinkCentre M83:
Table of Contents

Advertisement

7. To install a new hard disk drive into the blue bracket, flex the bracket and align pin
and pin
4
on the bracket with the corresponding holes in the hard disk drive. Do not touch the circuit
board
5
on the bottom of the hard disk drive.
Figure 65. Installing the hard disk drive into the bracket
8. Slide the new hard disk drive into the bracket until it snaps into position.
Figure 66. Installing the primary hard disk drive
9. Connect the signal cable and the power cable to the new hard disk drive.
What to do next:
• To work with another piece of hardware, go to the appropriate section.
• To complete the installation or replacement, go to "Completing the parts replacement" on page 156.
Chapter 8
.
Replacing FRUs (machine types: 10A0, 10A1, 10A6, 10A7, 10AG, 10AK, 10AL, and 10BE)
1
, pin
2
, pin
3
,
127

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkcentre m93pThinkcentre m93

Table of Contents