4. INSTALLATION
4.1 Unpacking
The appliance is delivered in 2 cartons.
4.1.1 The large carton contains the boiler, and the Installation/Servicing and Users Instructions.
4.1.2 The second carton contains the wall fixing bolts (x2), flue assembly, water heater bend and gas
cock.
4.2 Wall mounting
After selecting a suitable place for the water heater, mark location for fixing holes. Using 8 mm drill,
drill 60 mm deep holes to accept fixing bolts and insert. Tighten nuts until secure, then remove nuts
leaving studs protruding, hang water heater and refits nuts to secure.
Supplied By www.heating spares.co Tel. 0161 620 6677
S.p.A.
c
c
Fig. 5
d
11