Page 1
Improper installation, adjustment, alteration, service, or maintenance can cause property damage, injury, or death. All work must be carried out by appropriately qualified persons. Subject to modifications Reznor U.K. Limited – Park Farm Road – Folkestone – Kent – tel 01303-259141 – fax 01303-850002...
Adjustments A permanent electricity supply of 230 volts, 50 Hz, Air Heater Controls & Operation single phase is required. Options Model RHC 8000(M) RJL heaters are approved for 5.7.1 2 stage burner control 5.7.2 Modureg V7335A 2000 series modulation outdoor or rooftop application.
2.3 W EIGHTS Type 8030 06 8045 09 8050 06 8060 12 8075 09 8075 15 8090 18 8100 12 Unit Packaging Total Type 8125M.15 8150M.18 8175M.21 8200M.24 Unit Packaging Total turbulent air flow across the heat exchanger resulting in heat 3.0 GENERAL REQUIREMENTS exchanger spots and nuisance shut down of the gas burner due to localized overheating, thus activating thermal over-...
The maximum allowable airflow [ through the enclosure 3.5 M AXIMUM AIRFLOW CONDITION (duct channel) around the tubes ] can be calculated as Special attention must be given to ensure that the follows : temperature rise of the air, passing through the enclosure (duct channel) around the heat exchanger tubes, is high ×...
Gas Appliance Directive. Figure 6. : General arrangement combustion air inlet and flue products outlet for RHC 8000(M) RJL units 90° bend with seal ring (PN 60 50733 Flue extension, if required ∅...
Page 13
ASSURE THE SEALING OF THE COMBUSTION AIR INLET GRILL TO THE CONTROLS COMPARTMENT SIDE PANEL IS WATERTIGHT (n° 59008_03) Figure 8: Controls compartment (side) panel for RHC 8000(M) RJL units HOLE (∅112mm or ∅142mm) REQUIRED TO RECEIVE SEALRING (PN 06 22786 104 or 06 22786 134)
Page 14
5/4. the mounting flange of the RHC 8000(M) RJL heat The hole size required for the seal ring in the casing exchanger enclosure are indicated in figure 7 & 8.
Page 15
TTENTION Flue pipe requirements for RHC 8125M 15, RHC 8150M 18, RHC 8175M 21, RHC 8200M 24 RJL : To guarantee that the above-mentioned units are air as indicated in the table below. The openings to be working on 91% efficiency, it is necessary to seal a sealed depend whether it concerns a horizontal or number of openings in the inlet grill of the combustion vertical unit.
Attention : gas service connection Rc 3/4 for models RHC 8000 RJL & Rc 5/4 for models RHC 8000M RJL RHC 8000(M) RJL air heaters are designed to operate on either natural gas (G20) or propane (G31) / butane (G30) gas.
4.0 INSTALLATION 5.0 COMMISSIONING & TESTING 4.1 U Appropriately qualified persons may only carry out the NPACKING AND PREPARATION commissioning and testing. Prior to dispatch, the air heater was operated and tested at This section should be read and fully understood before the factory.
5.3 L IGHTING THE AIR HEATER Caution: Never use a flame for testing for gas RHC 8000(M) RJL air heaters are all fitted with automatic soundness spark ignition systems. When adequate airflow for combustion is proven by an air proving control and a pre- purge period has elapsed, the integral igniter and multi- 5.5 A...
45 seconds (if wired). RHC 8000(M) RJL air heaters are fitted with a pressure sensitive, combustion air safety control that monitors pressure differential of the combustion airflow. The control operates with the settings given in table 4 (settings are for 5.7 O...
Page 20
Nomenclature Figure 11 : V 4336A .. Gas valve operator This option may only be used in conjunction with appliances fitted with Honeywell multi-functional gas controls types VR 4601P.. or type V 4600P.. The valve operator V 4336A.. 3/20 for natural gas or V 4336A..4/37 for propane gas may be used to replace the single stage gas regulator already fitted if conversion is being under taken.
= Propane/Butane gas, outlet pressure range 4,0 - 37,0 mbar Caution: Reznor air heaters must be controlled so that burner start-up takes place in the high fire (100%) mode. Modureg gas pressure regulators require to be powered by a maximum 24 V DC voltage over the range 15 - 165 mA maximum.
Figure 12: Modureg V7335A FAULT FINDING “MODUREG” OPERATION : Follow setting procedure for fault finding Minimum or Low Fire unobtainable : Ambient temperature too high in location of regulator max 70°C; Check input voltage to coil, Zero volts is low fire mode, shaft out; Cannot obtain Maximum or High fire : Open circuit to regulator coil;...
Reznor RHC 8000(M) RJL air heaters will operate with a Instructions for testing pressure are given in section 5.5. minimum of maintenance. To ensure long life and satisfactory and safe performance, an air heater that is 5.
Figure 13 : 7.3 I GNITION SYSTEM Removing the burner rack/manifold assembly (for clarity, the heater cabinet & other parts are not To access the ignition system, follow steps 1 to 3 in section illustrated). Do not remove the burner box assembly 7.1.
Page 25
Figure 14a : View of the Control Compartment RHC 8000 RJL models Legend : 11 Differential pressure point 1. Flame sensor 12 Combination gas valve with pressure regulation LC1 limit control (without reset) 13 Manifold & injectors 3. Electrical wiring panel 14 Ignition electrode 4.
Page 26
Figure 14b : RHC 8000M RJL models 1. Flame sensor 11 Differential pressure point LC1 limit control (without reset) 12 Combination gas valve with pressure regulation 3. Electrical wiring panel 13 Manifold & injectors 4. Reset lockout signal lamp 14 Ignition electrode 5.
LIMIT CONTROLS If it is determined that the thermal overheat control needs replacing, use only Reznor authorized replacements that are designed for this appliance. To gain access to the control, open the hinged controls compartment access door. Refer to figure 14 for control locations. The control near the top of the air heater is a disc type control.
8.0 FAULT FINDING 8.1 M "OFF", AIN FAULT FINDING CHART OCKOUT INDICATOR LIGHT IS BUT AIR HEATER WILL NOT OPERATE WARNING: Fault finding may only be carried out by appropriately qualified persons Is the thermostat above room temperature and if Set thermostat above used is the time room temperature &...
Page 29
8.2 I "ON" GNITION ONTROLLER OCKOUT INDICATOR IGHT EPEATEDLY OMES WARNING: Fault finding may only be carried out by appropriately qualified persons Is polarity of mains correct? Correct polarity Does the inlet gas pressure agree with the correct the gas supply data badge pressure Wait 15"...
Page 30
WARNING: Fault finding may only be carried out by appropriately qualified persons Note : RHC 8000(M) RJL air heaters are equipped with 2 limits (a recycling limit and a manual reset limit). During normal operation, neither limit should trip even if the main electric supply is interrupted during operation.
Page 31
8.4 F AULT INDING HART WARNING: Fault finding may only be carried out by appropriately qualified persons Adjust thermostat temperature setting above ambient to energize the fan and the fan solenoid valve Place the Does the fan system in Is there 220-240V operate ? normal at terminals N &...
4. In the event of difficulties in resolving any of these valve shut down. matters, please do not hesitate to contact Reznor or their 2. Safety against overheating is assured by two overheat official distributor.
12.7 Electrolytic Capacitor 12.3 Declaration Two types are used by random selection: Reznor products contain no asbestos; copper is not Recognition: 1. Plastic enclosure 2. Aluminium employed in gas carrying components; solder which enclosure has a melting point below 450 C is not used; paints...
Need help?
Do you have a question about the RHC 8000(m) RJL and is the answer not in the manual?
Questions and answers