Download Print this page

Motorola AP-5181 Deployment Manual page 32

Hide thumbs Also See for AP-5181:

Advertisement

32
AP5181 Access Point
Two brass wiring glands are included with the AP-PSBIAS-5181-C-R.
Instructions display below for a single gland installation, but both glands are installed in the same manner. The
installer shall disassemble the glands and retain any loose components within the gland.
The top portion of the gland is installed into the AP-PSBIAS-5181-C-R threaded boss and tightened to 8-10ft-lbs.
Note that the long threaded end of the gland is threaded into the plastic boss.
The bottom of the gland is then loosely re-assembled to the top of the gland. Note the installation orientation of
the compression sleeve (beveled edge orients into bottom side of gland, the flat end is placed against washer)
and compression washer.

Advertisement

loading