Download Print this page

Power Tap Installation - Motorola AP-5181 Deployment Manual

Hide thumbs Also See for AP-5181:

Advertisement

16
11. The heavy weather protected AP-5181 is now ready for installation.

Power Tap Installation

The installation of the AP-5181 Power Tap (Part No. AP-PSBIAS-5181-01R) requires the services of licensed and
trained electricians. The end user is solely responsible to ensure the unit is installed and maintained by properly
certified personnel. Additionally, the end user is responsible the unit is installed and maintained in full compliance
of local codes and standards.
WARNING! DO NOT open an installed or operating Power Tap unit. Always make sure the unit is
Before attempting to install a Power Tap, refer to the following guidelines:
• DO NOT open an installed or operating unit. Ensure the unit is not energized before opening an installed or
functioning unit.
• A Power Tap installation requires the services of licensed and trained electrician.
• Proper unit earth grounding is required to ensure safe and proper operation. Earth grounding must comply with
all specific or regional electrical codes and regulations.
• Opening the Power Tap exposes high voltage wiring, and creates a shock hazard. Care must be taken to avoid
introduction to the unit interior of any foreign object and/or fluids that would facilitate a shock hazard.
not energized before opening an installed or operating unit.
AP5181 Access Point

Advertisement

loading