Download Print this page

Motorola AP-5181 Deployment Manual page 28

Hide thumbs Also See for AP-5181:

Advertisement

28
10. Tighten the finger nut snugly onto the port. Next, tighten the gland assembly onto the flange barrel. Finally,
tighten the gland nut onto the gland assembly. When completed, the assembly will be weather resistant
to IP56, and offer reasonable strain relief to the cable.
NOTE
11. Locate 2 port covers, and 3 antenna connection covers within the AP-5181-13040-WWR product package.
12. Install these covers on any un-used ports and hand tighten (use no tools).
Un-used connectors need to be sealed to ensure the product's IP56 rating.
AP5181 Access Point

Advertisement

loading