Download Print this page

Motorola AP-5181 Deployment Manual page 8

Hide thumbs Also See for AP-5181:

Advertisement

8
The image displayed above has the heavy weather accessory kit installed. Whether the unit is installed
with the heavy weather kit, or without it, it will be important to connect the
AP-5181 to an appropriate earth ground using the earth-ground boss on the back of the unit.
NOTE
4. Thread the 2 band clamps through the adapter.
Using both band clamps, position the adjuster screw about 6 inches from the face of the adapter. The
adjuster screw can be installed to either left or right sides.
5. Mount the adapter to the tilt bracket using 2 short binder head screws. It does not matter which side is
up or down, left or right. Tighten the screws securely.
It is necessary to use the band clamp adapter when installing an AP-5181 on a larger
diameter pole (up to 18 inches).
AP5181 Access Point

Advertisement

loading