Download Print this page

Motorola AP-5181 Deployment Manual page 21

Hide thumbs Also See for AP-5181:

Advertisement

Deployment Guide
14. Ensure no loose hardware is inside the housing. Check the wiring to be sure it is clear of the cover.
Carefully replace the cover. Only the correct cover orientation (as displayed below) allows all screws to
be properly installed.
15. Tighten all 10 screws securely. Torque all screws to 15-20 in-lbf. Hand tighten only. Do not use power
tools.
16. The Power Tap can now be installed.
NOTE
17. Add the required grounding lug or cable (not included with this product) the earth ground boss.
Please locate the earth ground boss under the bracket of the Power Tap. This point
must be properly grounded to earth to utilize this product's safety features.
21

Advertisement

loading