Installation in unfinished buildings
Residual heads
Installation on mounting frame
B
A
For gas combination boiler
Screwed connection
Residual heads
Flow rate in ltr/h
8
C
D
E
F
For gas central heating
boiler
Screwed connection
A First stage
B Second stage
Mounting frame
for Vitodens and wall-mounted DHW cylin
der (80 litres capacity).
Suitable for mounting on the wall, for free
standing installation or for planking.
With fittings and b" angle gas cock with
thermal safety shut-off valve.
H for gas combination boiler
with soldered connection
with screwed connection
H for gas central heating boiler
with soldered connection
with screwed connection
A Vitodens
B Wall-mounted DHW cylinder (80 litres
capacity)
C Mounting frame for wall-mounted
DHW cylinder including extension for
ceiling mounting
D Extension for ceiling mounting
(Vitodens)
E Extension for diaphragm expansion
vessel installed on site
F Mounting frame for Vitodens with
connection panel