6.2

Phase Balancer

An unbalanced load ist he difference between the nominal AC power
on the three mains phases.
The energy provider and the power plant operator determine the
admissible maximum unbalanced load for the installation of inverters
on different phases of the supply mains.
PLATINUM Inverter 13000 TL, 16000 TL, 19000 TL, 22000 TL are
equipped with three inverter modules, each of which feeds AC power
on a mains phase.
The Phase Balancer function makes sure that the admissible
maximum unbalanced load is not exceeded.
Failure of an inverter module
different AC powers occurring in dependence of the load
It is possible to set the admissible maximum power (unbalanced load)
and the reaction time according to the specifications of the power
plant operator (see 8.1 Service Menu).
6.3

Replacing devices

If one or more PLATINUM inverters in a PV system are replaced by
another device, it is possible to transfer the device numbers of the
replaced inverters.
During the network scan, the inverter automatically identifies any
replaced devices.
It is possible to either use the old device numbers for the substitute
devices or renumber the devices.
If inverters without a device number or doubly allocated device
numbers are detected during the network scan, it is possible to
correct this by renumbering them.
Display and operation are confined to the replaced inverters. All other
inverters show the start screen.