Download Print this page

Putting Into Service - KERN FTB Operating Instructions Manual

Electronic platform balance
Hide thumbs Also See for FTB:

Advertisement

1

Putting into service

Please read through these operating instructions carefully and adhere to them at all times. If you discover
that materials are missing or that the wrong ones have been supplied, or if you have any other problems
with your scale, please refer to the dealer or salesperson concerned.
1.1
Unpacking and checking contents
1.2
Safety and environmental protection
4
IP65
ca. 3cm
underneath the load plate support
base
hazardous areas
wet areas or dusty environments
IP 65 ingress protection
power cord
retaining screws for the load plate support
approved accessories and peripherals
wet cleaning
never insert a solid object
screws in its

Advertisement

loading