Bull Escala EPC400 Connecting Manual page 37

Bull escala epc series rack-mountable servers connecting guide
Hide thumbs Also See for Escala EPC400:
Table of Contents

Advertisement

Figure 8. PWCCF08: 2–node EPC – (1 System Console, 1 Graphic Display).
Note: The Ethernet cable is not mandatory. The LAN network can be used to reach Node 2
from Graphics Displays
6-7
Console Cabling Requirements

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Escala epc800Escala epc1200

Table of Contents