Toshiba RAS-4M23SAV-E Service Manual page 98

Split type
Hide thumbs Also See for RAS-4M23SAV-E:
Table of Contents

Advertisement

11-9-5. Checking Method for Each Part
No.
Part name
1
Electrolytic capacitor
(For raising pressure,
smoothing)
2
IGBT module
1. Turn OFF the power supply breaker.
2. Discharge all three capacitors completely.
3. Check that safety valve at the bottom of capacitor is not broken.
4. Check that vessel is not swollen or exploded.
5. Check that electrolytic liquid does not blow off.
6. Check that the normal charging characteristics are shown in continuity test by
the tester.
C10
C11
C10, C11, C12, C13 → 500µF/400V
1. Turn OFF the power supply switch.
2. Discharge all four electrolytic capacitors completely.
3. Execute continuity test with a tester.
+
BU
BV
U
V
BX
BY
+
Tester rod
Case that product is good
– 98 –
Checking procedure
C12
C13
Case that product is good
Pointer swings once, and returns
slowly. When performing test
MCC-1438
once again under another
Soldered
polarity, the pointer should return.
surface
BZ BY BX
BW
W
BZ
+
U
V
W
U
V
W
W
U
1M or more 100k to 300k
+
W
V
U
BW
BV
BU
U
V
W
+
V
200k to 300k

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents