Online Power Protector 3 User Manual page 61

Three phase uninterruptible power system 10 – 62.5 kva
Table of Contents

Advertisement

OnLine Power
Yellow
6.18.6.7
Installation Procedure
Before you start using GWS , you will need to set-up both the hardware and software. The following is a
flow chart on the installation procedure:
On: Internet correspond speed is 10M
Flash: Data transmitting / receiving
Fig.7 GWS LAN LED Indicator
Connect the designated serial device, power
adaptor and Ethernet cable to GWS.
Install Netility supplied in the Utility CD.
Use Netility to set up the IP (for Static IP)
Connect the designated serial device, power
adaptor and Ethernet cable to GWS.
Set-up completed
Fig.8 GWS installation flowchart
6-22

Advertisement

Table of Contents
loading

Table of Contents