3c. Operating the pump - Operating the enviroMAX from the control panel
1. Press the START key and the pump will run the programmed 24 hour duration schedule. The START event will be stored. Should a
power outage occur, the pump will automatically re-start at STEP 1 when power is restored.
2. The pump will always run the PRIMING sequence when it starts from the OFF state, including when it automatically restarts following
a power outage. The default Prime setting is defined in the "Priming" section, see page 9.
3. The pump then starts running in STEP 1 at the programmed DURATION and SPEED. The "ACTIVE LED" for STEP 1 will switch ON.
The DURATION and SPEED setting LEDs along with the respective bar graph LED will blink back and forth every three (3) seconds.
4. This sequence will then repeat for STEP 2 and then STEP 3 without the pump stopping.
5. At the end of STEP 3, the pump will wait if necessary for the completion of the 24-hour schedule. During this waiting period (if
applicable), all of the "active step LEDs" will remain OFF. However, the START LED will still be illuminated. After completion of the 24
hour schedule, the system restarts at STEP 1 and this cycle will repeat indefinitely until the user presses the STOP key.
Note: Pressing a STEP key other than for the STEP currently running will cause an immediate transition to the newly selected STEP.
The pump will continue with the programmed schedule from that point forward.
Note: If STOP is pressed during normal schedule operation, the 24 hour schedule will stop. When START is pressed again, the 24 hour
schedule will start from STEP 1.
Note: If power is lost while the pump is running a 24 hour schedule, upon restoration of power the pump will start the 24 hour schedule
from STEP 1.
Note: If an automation input (provided from an external source) is detected, the pump will start running on the STEP 1, STEP 2, STEP 3,
or OVERRIDE speed corresponding to the digital input. Upon removing the digital input (provided from an external source), the pump
will stop and the user will need to press START to begin the 24 hour schedule operation. However, if START was already pressed
prior to receiving a digital input, then the pump will resume running the 24 hour schedule once the digital input is removed.
Note: Pressing STOP at any time turns the pump OFF and clears the start time for the 24 hour schedule.
3d. Operating the pump - Override
The enviroMAX is equipped with an OVERRIDE feature, which can be engaged to temporarily run at higher or lower speeds ranging
between 600 to 3450 RPM. Once the OVERRIDE duration has elapsed, the pump will automatically return to the programmed
schedule.
1. Pressing the OVERRIDE key while the pump is running will cause the pump to start running in the OVERRIDE mode at the
programmed DURATION and SPEED. The "active LED" for OVERRIDE will illuminate. The DURATION and SPEED setting LEDs along
with its respective bar graph LED will blink back and forth at three (3) second intervals.
2. The UP (+) / DOWN (-) arrows allow the user to configure OVERRIDE DURATION and SPEED. These settings can be changed while the
pump isrunning. These settings are stored each time the UP (+) / DOWN (-) arrows are pressed.
Note: When the OVERRIDE duration ends, the pump resumes the 24 hour schedule at the point in the currently programmed 24 hour
schedule where it normally would be running at that time. The OVERRIDE duration will not affect the start or stop times of the 24 hour
schedule. For example, if OVERRIDE runs during a period overlapping with a later part of STEP 1 and an early part of STEP 2, the
start time of STEP 3 is not affected.
Note: Pressing/Holding OVERRIDE key for more than three (3) seconds will cancel OVERRIDE mode.
Note: During the OVERRIDE mode, the pump will not start with the priming sequence.
Note: It is recommended that you do not set the OVERRIDE duration to 0 HRS. Setting the OVERRIDE duration to 0 HRS will not allow
you to change the duration setting while the motor is running. The motor will have to be stopped in order to change the OVERRIDE
settings if the duration is set to 0 HRS.