Cornelius Liquid Base Beverage Dispenser Installation Manual
Cornelius Liquid Base Beverage Dispenser Installation Manual

Cornelius Liquid Base Beverage Dispenser Installation Manual

Liquid base beverage dispenser
Hide thumbs Also See for Liquid Base Beverage Dispenser:

Advertisement

INSTALLATION MANUAL

Liquid Base Beverage Dispenser
FRONT
ACCESS PANEL
CUP
REST
DRIP
TRAY

RECEIVING

Each Unit is completely tested under operating conditions and thoroughly inspected before shipment. At time of
shipment, the carrier accepts the Unit and any claim for damage in transit must be made with the carrier. Upon
receiving Unit from the delivering carrier, carefully inspect the carton for visible indication of damage. Any dam-
age or irregularities should be noted at time of delivery (or not later than 15 days from date of delivery) and im-
mediately reported to the delivering carrier. Request a written inspection report from the Claims Inspector to
substantiate claim. File claim with the delivering carrier, not with IMI Cornelius Inc.

INSTALLATION

Place Unit in selected location to install unit.
Use mounting template (See page No. 3), to drill mounting holes for installing unit to counter top.
Liberally apply a sealant, such as Dow Corning RTV 731 or equivalent, to the unit flange bottom surface,per
(NSF) requirements, the unit must be sealed to the counter top.
Make connections as follows:

Plain Water Source Connections:

TO THE INSTALLER
It is the responsibility of the installer to ensure that the water supply to the dispensing equipment is
provided with protection against backflow by an air gap as defined in ANSI/ASME A112. 1.2-1979; or an
approved vacuum breaker or other such method as proved effective by test.
IMI Cornelius Inc; 1998
24 VOLT
TRANSFORMER
(24 Volts) cord to
dispensing valves
SUPPLY INLET
IMI CORNELIUS INC.
One Cornelius Place
Anoka, MN. 55303–6234
Telephone (612) 421–6120
Facsimile (612) 422–3232

Design data

Overall Dimensions:
Width
Height
Depth
Weight:
12 lbs
Electrical Requirements:(if applicable)
15 Amp Circuit, 115v 60hz
.52 Amp Unit Current Draw
24v 60hz, Dispensing valves

Installation Check List :

Counter Top with access to route
concentrate supply lines.
Cold Water Supply, With Shutoff
15 Amp,115v60hz Outlet, Within 5'
(if applicable)
10 3/4"
21"
9 1/8"
P/N 630460068
July 8, 1998

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Liquid Base Beverage Dispenser and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Cornelius Liquid Base Beverage Dispenser

  • Page 1: Installation Manual

    (or not later than 15 days from date of delivery) and im- mediately reported to the delivering carrier. Request a written inspection report from the Claims Inspector to substantiate claim. File claim with the delivering carrier, not with IMI Cornelius Inc. INSTALLATION Place Unit in selected location to install unit.
  • Page 2 Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed, and maintained according to Federal, State, and Local laws. 1. Flush plain water source thoroughly before connecting to Unit. 2. Connect plain water source to water inlet tube labeled ‘‘WATER’’. Concentrate Line Connection: 1.
  • Page 3: Dispensing Valves

    ADJUSTABLE WATER ADJUSTABLE CONCENTRATE FLOW REGULATOR FLOW REGULATOR ”WATER” IN ”WATER” IN CONCENTRATE NO. ”1” IN ”WATER” IN CONCENTRATE NO. ”1” IN CONCENTRATE NO. ”2” IN TWO SINGLE-FLAVOR ONE SINGLE-FLAVOR DISPENSING VALVES DISPENSING VALVE CONCENTRATE NO. ”1” IN ”WATER” IN CONCENTRATE NO.

Table of Contents