Schwank STR-JZ Installation & Owner's Manual page 24

Low intensity tube type infra red heater residential garage / workshop
Table of Contents

Advertisement

NOTE: Except for the vent end plate hanger, all hangers must be installed with the cavity side
facing the burner end of the system - the cavity side of the vent end hanger must face
the vent
FIGURE 15 REFLECTOR EXTENSIONS
Reflector extensions
may be installed one
or both sides
1. Reflector extensions may be installed on
one side or both sides of the reflector
2. Reflector extensions are 116" (295 cm)
long
3. Holes (3) for "S" hooks are located
2.25" (5.7 cm) from each end and one at
the center of the reflector extension
4. Drill 1/4" (7 mm) holes in the reflector
3/4" (2 cm) up from the bottom edge of
the reflector to align with the 3 holes in
the top of the reflector extension
5. Insert "S" hook down through hole in the top of the reflector extension
6. Rotate "S" hook approx. 90°, and insert into hole in reflector
7. Settle reflector extension into place
STR-JZ I&O Manual
IM090831
RD: AUG 2009
RL: 09A- BA
1
(OPTIONAL - IF REQUIRED )
Insert
'S'
hook from
top
and
rotate
24
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Str-jz seriesStr-jz 60Str-jz 45

Table of Contents