Schwank STR-JZ Installation & Owner's Manual page 14

Low intensity tube type infra red heater residential garage / workshop
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS FOR 90° AND 180° ELBOW KITS
When installing systems that incorporate a 90° or 180° elbow, assembly of the system is facili-
tated by first locating and installing the elbow assembly, then install the remainder of the tube/
reflector system working away from the elbow.
SWAGED END
STR-JZ I&O Manual
IM090831
RD: AUG 2009
RL: 09A- BA
FLOW DIRECTION
CAVITY
SIDE
90° ELBOW KIT ASSEMBLY
#1
Add the coupler to the 90° elbow over the
swaged end of the elbow.
#2
Slacken the coupler bolts. Slide the cou-
pler over the elbow from the swaged end.
#3
Add the plate hanger to the system
Important: the plate hanger must be in-
stalled with the cavity side facing up-
stream toward the burner.
#4
Install the next plate hanger (supplied
with tube kit) over the unswaged end of
the elbow with the cavity side facing up-
stream toward the burner.
(Not to be reversed)
#5
Place the reflector over the plate hang-
ers. Secure reflector to hangers with
sheet metal screws provided.
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Str-jz seriesStr-jz 60Str-jz 45

Table of Contents