Securing Liner To Chimney Ring; Outside Air Installation - Quadra-Fire 4100I-GD-B Manual

Wood insert advanced combustion technology (act)
Hide thumbs Also See for 4100I-GD-B:
Table of Contents

Advertisement

There are two options to secure the liner to the chim-
ney ring: See Figure 13A.
Option One: If there is enough room on the top of the
insert to work, hand bend the two tabs upward 90°.
Secure the liner with the supplied hex head bolts 1/4-
20-3/4.
Option Two: Remove the manifold tubes, fi berboard
baffl e and ceramic blanket. From inside the fi rebox,
pull liner down through the chimney ring below the
outer skin. There are two pre-drilled holes in the chim-
ney ring 180° apart. Secure the liner with the supplied
hex head bolts 1/4-20-3/4.
NOTE: Tabs are shipped from factory in a fl at position.
Bend upwards 90 degrees.
IMPORTANT!
THE ZERO CLEARANCE
FIREPLACE OUTSIDE
AIR MUST BE TURNED
TO "ON"
Tools Needed: Phillips Head Screwdriver
1. Remove three screws and cover plate from back side of insert. Save the screws.
2. Re-attach the cover plate using the same screws to front side of the insert as shown in Figure 13B.
3. Repeat same procedure for other side of insert.
NOTE: This insert requires replacement of combustion air. If your home is fairly air-tight, it is recommended that
you install outside air. If you are installing into a Mobile Home, outside air is required. See page 9.
March 27, 2008
4100-I ACT WOOD INSERT

SECURING LINER TO CHIMNEY RING

OUTSIDE AIR INSTALLATION

2. Re-install plate
250-7201 Rev D
2 pre-drilled holes on
chimney ring under outer skin
(access through firebox)
Figure 13A
Figure 13B
R
Page 13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4100i-nl-b4100-i act

Table of Contents