Juniper ULTRA-RUGGED FIELD PC Reference Manual page 163

Table of Contents

Advertisement

7. If you are using the Data
Acquisition (DAQ) Cap, plug
the wiring harness into the
inserted Data Acquisition
CF card.
8. Tighten the cap screws until they are firmly in
place. If you inserted foam into the
cap in step 6, first press down on
the cap so the screws engage.
To properly seal the cap, apply
an extra ¼ or ½ turn after the
screws become hard to turn.
Note: Even if a small gap
remains between the
extended cap and the body
molding, the Field PC is
fully sealed.
9

Advertisement

Table of Contents
loading

Table of Contents