Download Print this page
Juniper Allegro CE Installation And Quick Start Manual
Juniper Allegro CE Installation And Quick Start Manual

Juniper Allegro CE Installation And Quick Start Manual

Hide thumbs Also See for Allegro CE:

Advertisement

Quick Links

Prosurv CE Installation and Quick Start Guide for Allegro CE
Prosurv CE
Allegro CE
Installation And
Quick-Start Guide
Contact Information
Prosurv, LLC
185 Louis L'amour Lane
Clark, WY 82435
Toll-free 888-647-9500
Web site: www.prosurv.com
E-mail: sales@prosurv.com
techsupport@prosurv.com
Page 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Allegro CE and is the answer not in the manual?

Questions and answers

Summary of Contents for Juniper Allegro CE

  • Page 1 Prosurv CE Installation and Quick Start Guide for Allegro CE Prosurv CE Allegro CE Installation And Quick-Start Guide Contact Information Prosurv, LLC 185 Louis L’amour Lane Clark, WY 82435 Toll-free 888-647-9500 Web site: www.prosurv.com E-mail: sales@prosurv.com techsupport@prosurv.com Page 1...
  • Page 2 Prosurv CE Installation and Quick Start Guide for Allegro CE Installing Prosurv CE to the Allegro CE Important Notes • Installation of Prosurv CE is done through your PC • Be sure that you have installed ActiveSync on your PC (version 3.0 or later), and that...
  • Page 3 Prosurv CE Installation and Quick Start Guide for Allegro CE Your folder should now contain the files shown on the left. Step 3: Install Prosurv CE You can view the ReadMe.txt file for the latest installation and version information for Prosurv CE.
  • Page 4 Prosurv CE Installation and Quick Start Guide for Allegro CE After the PC has finished installing to your Allegro, the Allegro’s own installer will take over complete installation process automatically. A shortcut to run Prosurv CE is provided for you on the Allegro’s desktop.
  • Page 5 Prosurv CE Installation and Quick Start Guide for Allegro CE Step 4: Allegro Changes 1. Increase Program Memory Go to Start—>Settings—>Control Panel, then double-tap the System Icon. Select the Memory tab and slide the vertical slide bar towards the left, so that Program memory has at least 40000KB (~40MB RAM).
  • Page 6 Prosurv CE Installation and Quick Start Guide for Allegro CE Prosurv CE utilizes the entire 320x240 screen available on the Allegro CE. By setting the Taskbar to Auto-hide, you ensure that all Prosurv CE screens are completely visible. Tip: To switch between a running application (such as Prosurv CE) and your Allegro’s desktop,...
  • Page 7 Prosurv CE Installation and Quick Start Guide for Allegro CE If you have been issued a trial version of Prosurv CE, you will see a notice, like the one shown here, each time you start Prosurv CE. After the trial period, Prosurv CE will no longer run and a new full Registration Key will be required.
  • Page 8 Prosurv CE Installation and Quick Start Guide for Allegro CE 2. Drag and Drop or Copy/Paste the Sample.cdb job file into the new folder, so the path on the Allegro to the job is \C_Drive\Jobs\Sample\Sample.cdb • Tap OK if a window pops up during the copying of the file 2.
  • Page 9 Prosurv CE Installation and Quick Start Guide for Allegro CE Prosurv CE Quick Start Guide The Prosurv CE Main Menu 570x570 Graphics Screen Quick Pick Settings Quick Pick Tools See Below Informative Messages Graphics Toolbar Activate Hot Keys Store Picked Points to SET...
  • Page 10 Prosurv CE Installation and Quick Start Guide for Allegro CE Prosurv CE Quick Start Guide The Prosurv CE Data Collection Menu Setup Information DC Info Screen Last Shot’s Data Shortcuts for DC Routines Top Toolbar Bottom Toolbar • • Bring Elevation From Benchmark Stake to a Line 2D or 3D •...
  • Page 11 Prosurv CE Installation and Quick Start Guide for Allegro CE Where to Find Routines in the Main Menu • Create and Open Jobs • Import / Export points • Merge points from other jobs (ie bring in control points from a control point job) •...
  • Page 12 Prosurv CE Installation and Quick Start Guide for Allegro CE • 9 Different Reports • Up to 500 points per report • Save reports as text files or view on-screen All Coordinate Geometry (ProGo) functions are found under two pull-downs...
  • Page 13 Prosurv CE Installation and Quick Start Guide for Allegro CE • Set your Decimals and Units • Select a SPC Zone or UTM Zone • Close the Job and exit Prosurv CE • View the current version of Prosurv CE...
  • Page 14 Prosurv CE Installation and Quick Start Guide for Allegro CE Where to Find Routines in the Data Collection Menu • Elevations On/Off • Bring Elevation from Benchmark • Adjust Blown Target Heights • Compute End Areas & Volumes • Set Temperature, Pressure, and Scale Fac- •...
  • Page 15 Prosurv CE Installation and Quick Start Guide for Allegro CE All Staking routines under the Stk pull-down. • 3D Inverse • Traverse by Closing the Horizon • Instrument/Timeout/Com Port Settings • Other Parameters • About Prosurv Data Collection • Comm Port settings (overrides default in- strument settings) •...