Schwank STV-JZ Owner's Manual page 16

Vacuum series low intensity tube type infra red heaters
Table of Contents

Advertisement

TABLE 4
MODEL
STV-JZ 155-60
STV-JZ 155-50
STV-JZ 155-40
STV-JZ 130-50
STV-JZ 130-40
STV-JZ 130-30
STV-JZ 110-50
Where required the STV-JZ Series Heaters will be supplied with the turbulators
NOTE:
factory installed into the end tube(s) of the system configuration, and the tubes
marked for easy identification on site.
FIGURE 10 COUPLER
1
1. Tube
2. Tube Coupler
3. Swaged section of tube
4. Point at which the Swaged tube slides into
other section of tube
5. Line of the joint
TURBULATOR LENGTH
(IF REQUIRED)
not required
not required
10'
not required
10'
14'
not required
4
2
Once the two tubes are joined together,
place the centre of the Coupling over the
line of the joint and torque to 40 ft/lbs.
Page 12
MODEL
STV-JZ 110-40
STV-JZ 110-30
STV-JZ
80-40
STV-JZ
80-30
STV-JZ
80-20
STV-JZ
60-30
STV-JZ
60-20
3
5
TURBULATOR LENGTH
(IF REQUIRED)
10'
14'
10'
14'
14'
14'
14'
GP-MSJV-BX-07A
STV-JZ Manual
RD: MAR 2009
RL: 07A - BA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stv-jz series

Table of Contents