Cylinder Head (I) Assembly; Valve Seal Assembly Note; Valve Keeper Assembly Note - Mazda 2006-2008 RX7 Engine Workshop Manual

Engine manual
Table of Contents

Advertisement

CYLINDER HEAD (I) ASSEMBLY

1. Assemble in the order indicated in the table.
42—48 {4.3—4.8,
31.0—35.4}
SST
7
6
5
3
R
SST
4
1
Water outlet
2
EGR pipe
3
Valve seal
(See 01–10–35 Valve Seal Assembly Note)
4
Valve

Valve Seal Assembly Note

1. Press the valve seal onto the valve guide by hand.
2. Lightly tap the SST using a plastic hammer.

Valve Keeper Assembly Note

1. Install the valve keeper using the SSTs.
End Of Sie
Engine Workshop Manual LF L3 (1866–1U–05H)
MECHANICAL
.
8
1
56—60 {5.8—6.1,
8
41.3—44.2}
42—48 {4.3—4.8, 31.0—35.4}
8.0—11.5 N·m {81.6—117.2
kgf·cm, 70.9—101.7 in·lbf}
R
2
N·m {kgf·m, ft·lbf}
5
Valve spring
6
Upper valve spring seat
7
Valve keeper
(See 01–10–35 Valve Keeper Assembly Note)
8
Engine hanger
49 T032 302
VALVE
SEAL
49 0636 100B
E5U011002000E10
01–10
B3E0110E130
B3E0110E123
49 B012 0A2
B3E0110E124
01–10–35

Advertisement

Table of Contents
loading

Table of Contents