Saeco RUBINO 200 Operation And Maintenance page 12

Table of Contents

Advertisement

English
ESPRESSO COFFEE BREWING
This process takes place only after the
dispensing of cup, sugar and stirrer.
• the grinder (ref.1 fig.6) is activated until the
quantity of coffee set on the dosing unit (ref.2
fig.6) is reached
• the activation of the dosing unit solenoid (ref.
'3' fig. 6) causes the door to open and, as a
consequence, the coffee is dispensed into the
cup.
"1"
"2
fig. 6
• the unit rotation gear motor activates, thus
moving the unit to the brewing position. The
coffee tablet is pressed simultaneously.
• the pump brewing the set quantity of water
activates, under the control of an appropriate
electronic device (volumetric meter) (ref. '3'
fig. 5).
• the brew group gear motor is restarted, and
goes back to the rest position. During this
movement the coffee tablet is ejected.
The grinder and dosing unit activation sequence
can take place in reverse order, according to the
program selected (see programming menu).
FRESH BREW WITH PRE-GROUND
COFFEE
- unlike the figure of the expresso coffee
brewing, the fresh brew coffee cycle with
preground coffee does neither imply the
activation of the coffee grinder nor of the doser
soleoid. The gearmotor of the pre-ground
coffee, contained in the third instant product
container, activates the screw conveyor so
12
For more information visit www.Gumball.com | 800-260-0010 | +1-214-550-5079
- The group rotation gearmotor, which moves
- The cycle ends as described above in the two
FRESH BREW WITH COFFEE BEANS
"3"
- As for the expresso coffee brewing, the
- The group rotation gearmotor, which moves
- The cycle ends as described above in the two
EXPRESSO WITH PRE-GROUND COFFEE
- As shown for the brewing of fresh brew coffee
- the group rotation gearmotor, which moves
- the pump is activated and dispenses the
as to dispense the preset amount of product
into the brewing cup through the appropriate
channel.
the group in an advance brewing position as
regards to the one reached during the
expresso coffee brewing, is activated. As a
result, the compression of the coffee tablet
is lower so as to obtain a beverage which is
noticeably less full-bodied as regards to
expresso coffee.
final phases of the expresso coffee brewing.
brewing cup is filled through the activation of
the coffee grinder and, then, of the doser
solenoid.
the group in an advance brewing position as
regards to the one reached during the
expresso coffee brewing, is activated. As a
result, the compression of the coffee tablet
is lower so as to obtain a beverage which is
noticeably less full-bodied as regards to
expresso coffee.
final phases of the expresso coffee brewing.
with pre-ground coffee, the expresso coffee
cycle with pre-ground coffee does neither
imply the activation of the coffee grinder nor
of the doser soleoid. The gearmotor of the
pre-ground coffee, contained in the third
instant product container, activates the screw
conveyor so as to dispense the preset
amount of product into the brewing cup
through the appropriate channel.
the group to the brewing position and
simultaneously compresses the coffee tablet,
is activated.
preset quantity of water under the control of
an appropriate electronic device (volumetric
counter) (ref. "3" fig. 5).
The Brew Group gearmotor is activated again,
and goes back to the rest position. During
this movement the coffee tablet is ejected.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents