IBM eserver pSeries 690 Installation Manual page 77

Hide thumbs Also See for eserver pSeries 690:
Table of Contents

Advertisement

To install the frame, do the following:
Attention:
It is the service representative's responsibility to complete the following
steps.
1. Before starting the installation, check all cable openings in the floor panel and
location of the rubber bushing holes so that they match the dimensions given in
the following illustrations.
24 in REF
610 mm REF
64.6 mm
(4x) 450 mm REF
654.8 mm
64.6 mm
24 Inch Floor Tile Layout
(8) x 49.3 mm
Eyebolts
654.8 mm
(4) Opening for Cables
2440 mm REF
96 in REF
Appendix D. Securing the Rack
61

Advertisement

Table of Contents
loading

Table of Contents