6. Remove the BPEs (item 1 in the illustration on page 113).
Note: Two people are required to remove the BPEs.
1 Bulk Power Enclosure
2 Hex Head Screw Locations
__ Step a. Remove the five hex head screws from the front BPE.
__ Step b. Remove the five hex head screws from the rear BPE.
Install (2) shipping brackets (P/N 11P2923) on both the front and rear of the frame
using (8) M8X 16mm bolts (P/N 164803).
Appendix J. Removing and Installing the Rack Top Frame
113