6A3-26 4.3L V6 ENGINE
EGR VALVE INSTALLATION
Install or Connect
0
1. New gasket.
2. EGR valve.
3. Bolts or studs and nuts.
Q
Tighten
• Refer to specifications for proper torques.
FLYWHEEL INSTALLATION
-H -j Install or Connect
1. Flywheel.
2. Flywheel bolts.
Q
Tighten
• Bolts to 100 N m (75 ft. lbs.).
ENGINE ACCESSORY
INSTALLATION
Install the engine accessories (distributor, oil filter,
generator, etc.) as directed in the proper Truck Service
Manual. Connect all vacuum hoses and electrical
equipment the same way as removed.
Figure 45— Exhaust Manifold Installation
700. Bolt
701. Rocker Arm Cover
702. Gasket
Figure 4
A — Rocker Arm Cover Installation
700
F5520