Defrost Control - Daikin SiBE07-618_D Service Manual Field

C-series inverter pair duct connected type
Table of Contents

Advertisement

SiBE07-618_D

3.10 Defrost Control

Outline
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than a certain value to finish.
Detail
Conditions for Starting Defrost
Conditions for Canceling Defrost
The judgment is made with outdoor heat exchanger temperature. (4°C ~ 12°C)
A (seconds)
Function and Control
The starting conditions is determined with the outdoor temperature and the outdoor heat
exchanger temperature.
The system is in heating operation.
The compressor operates for 6 minutes.
44 minutes of accumulated time pass since the start of the operation, or ending of the
previous defrosting.
Frequency
ON
Compressor
OFF
ON
Four way valve
OFF
ON
Fan
OFF
Electronic expansion
valve opening
50 class
30
90 Hz
55 Hz
0 Hz
120 sec.
60 sec.
460 sec.
5 sec.
450 pulse
60 class
50
Control Specification
PI control
A
sec.
5 sec.
Initial opening
(R12238)
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents