We congratulate you on your choice of a Morso
stove. Morso has been producing some of the world's
best stoves since 1853. If you follow this Installation
and operating Instruction carefully, we can guarantee
you many years of warmth and pleasure.

DIRECTIONS FOR INSTALLATION

1. The stove must be installed according to the regulations laid down in the
building code; e.g. regarding the distance to combustible material. Out of
consideration for the cleaning, the distance to masonry should be 100 -150
mm. The non-combustible substructure should cover the floor in an area
of at least 500 mm in front of the stove and at least 100 mm at the sides
and behind the stove.
The opening formed by the firing door is less than 1000 sq.cms.
It is advisable to consult your local building authorities. Please notice the
rules in the building code concerning the installation of stoves, the
connection of these and the rules concerning the installation of chimneys.
2. After the unpacking place the stove on the side and mount the legs with
the enclosed bolts M 8x25. In order not to scratch the surface you may
place the stove on the packing.
3. The factory has provided the stove with rear smoke outlet. The lid (4)
must be detachable from the top plate and thus serve as a cleaning lid and
hot plate. When using this connection, the cleaning of the stove is
facilitated. If you desire a top smoke outlet, the flue is moved to the top
plate and mounted there. Afterwards the lid is mounted to the inner plate
with screws and tension disks.
In order to ensure sufficient draught the horizontal runs of the stove pipe
should be as short as possible and preferably rise a little towards the
chimney.
The flue must not be inserted in the chimney itself, but only to the edge of
the masonry. (Many chimney pipe-bushings have a built in stop,
preventing the pipe from being inserted too far). The stove pipe - chimney
connection should be sealed with fire proof seal.
4. Ensure that the baffle plates (1) are placed correctly. (See sectional
drawing).
5. The outer surface is susceptible to corrosion by acid. Therefore cover the
stove whenever acid is used in washing down the surrounding masonry.
6. The initial fire should be small in order to properly cure the stove
before starting a heavier fire.