Schwank UHE Installation And Owner's Manual page 16

High radiant output low intensity tube type infra red heater
Hide thumbs Also See for UHE:
Table of Contents

Advertisement

3) Suspend the first two hangers from the structure.

Locate the first hanger so that there will be 6 inches (15 cm) between the first hanger
and the tube flange

Locate the second hanger within 6 to 24 inches (15 to 60 cm) from the swaged end
of the tube

Result: The first and second hangers are spaced apart within 86 to104 inches (218
to 264 cm)
4) Insert the swaged end of the first tube (tube with flange) through and on to the second
hanger with the WELDED SEAM OF THE TUBE FACING DOWN
5) Insert the flanged end of the tube through and on to the first hanger . Position the tube so
that the first hanger is 6 inches (15 cm) from the tube flange

Check that the first tube is level - make adjustment to hanger height accordingly
6) At the swaged end of the tube, slide a Torctite tube coupler past the swage on to the tube

Special condition: 160,000 & 200,000 Btuh models - first, second (and third
200,000) tube joints - See Sections 9.1 & 9.2 & FIG 13 NOW

The final position of the coupler will be between the second and third hangers
7) Install a reflector over the first tube: Ensure that the end with the extended inner reflector is
located toward the burner

Insert reflector through the second 'downstream' hanger first, then slide back into the
first hanger
8) At the FIRST and SECOND hangers ONLY: (see FIGURE 8 below)
 Install hanger clips (4 supplied) on hangers - one on each side of first two hangers
 Position the hangers perpendicular (at right angle) to the tube and reflector.
 Using sheet metal screws provided, fasten the hanger clips to each side of reflector
FIGURE 8 FASTEN FIRST TWO HANGERS TO FIRST REFLECTOR (ONLY) - Each Side
Install a hanger clip on to
each side of first and sec-
ond hangers.
Position hangers perpen-
dicular to reflector.
Fasten hanger clips to
outer reflector with sheet
metal screws (provided)
each side of reflector.
UHE / EIH I&O Manual
IM100205
RD: MAY 2013
RL: 03D
16
ONLY

Advertisement

Table of Contents
loading

This manual is also suitable for:

EihUltraschwank uheInfrasave ultimate eih

Table of Contents