Schwank UHE Installation And Owner's Manual page 14

High radiant output low intensity tube type infra red heater
Hide thumbs Also See for UHE:
Table of Contents

Advertisement

FIGURE 6 HANGER / REFLECTOR ORIENTATION - HORIZONTAL TO 30
See Elbow Dimensions
FIGURE 7 HANGER POSITIONING / SPACING

POSITION BURNER END HANGER 6 INCHES (15 CM) FROM BURNER/TUBE FLANGE

POSITION INTERMEDIATE HANGERS A MINIMUM OF 6 INCHES (15 CM) TO A MAXIMUM OF
24 INCHES (60 CM) FROM EACH SIDE OF A TUBE CONNECTION

LOCATE VENT END HANGER WITHIN 12 INCHES (30 CM) OF THE END OF THE LAST RE-
FLECTOR
* ANGLE BURNER SUPPORT CHAIN BACK OVER BURNER TO ALLOW TUBE SYSTEM EXPAN-
UHE / EIH I&O Manual
IM100205
RD: MAY 2013
RL: 03D
~Page 40~
14
0
(at 30°)

Advertisement

Table of Contents
loading

This manual is also suitable for:

EihUltraschwank uheInfrasave ultimate eih

Table of Contents