Material and conveying lines
installed. If you plan to use
vacuum or compressed air
loaders to fill the hopper,
install conveying lines to the
drying hopper location.
3 - 4
l I n s t a l l a t i o n
P r e p a r i n g f o r I n s t a l l a t i o n
The Carousel Plus W Series Dryer is easy to install if you plan the location and
prepare the mounting area properly.
1
Make sure the mounting area provides:
❒ ❒ A grounded power source supplying the voltage and correct current
for your dryer model. Check the dryer's serial tag for the correct amps, volt-
age, phase, and cycles. Field wiring should be completed by qualified person-
nel to the planned location for the dryer. All electrical wiring should comply
with your region's electrical codes.
❒ ❒ A source of water, if you have an aftercooler and/or optional
precooler. The W dryer's aftercooler and optional precooler require 3
gals./min. {11.4 liters/min.} tower, city, or chiller water at temperatures of
45° to 85°F {7° to 29°C}. Pipe should be run to the planned dryer location.
Use flexible hose to connect the water pipes to the aftercooler and/or optional
precooler.
❒ ❒ Minimum clearance for safe operation and maintenance.
You should maintain 24 in. {61 cm} clearance on all sides of the dryer.