Connecting To Power - Edge Products Juice Installation Instructions Manual

Dodge edge juice/attitude system
Table of Contents

Advertisement

I N S T A L L A T I O N
Harness Connection Guide
Attitude Connector
Main Juice
Connector
EGT Probe Connectors
Follow all steps in the previous install section: "2003-2004 5.9L (CR)" in order
to install your MAP Connectors, Injector Connectors, and the Data Link Con-
nectors. Once complete, follow the rest of the steps in this section: "2004.5 -
2005 5.9L (600)" to fi nish the installation.
1. Using the ½" wrench, loosen both negative battery cables.
2. Remove cables from the battery posts and set aside.
3. Locate and remove Fuses 28 and 35 (10 Amp) from inside
the engine compartment fuse panel.
4. Insert the Leaded Fuse Links (see Figure 2). The leg with
the wire soldered to it needs to plug into the "HOT" side of the
fuse location. Orient the fuse exactly as shown in Figure 3 on
the following page.
5. From the main harness, connect the Yellow Power Connec-
tors to the installed Fuse Links (Figure 3)
WARNING An electrical charge or battery acid can burn you. Battery
gas can explode or ignite. Take care when working around the battery. Follow
instructions in the vehicle owner's manual for disconnecting and reconnecting a
battery.
NOTE: DO NOT reconnect battery until installation is complete. Connecting
power may cause fault code in the ECM.
24
Ground Connector
Figure 1 - 2004.5 - 2005

CONNECTING TO POWER

D o d g e
I n s t a l l a t i o n
Fused Power Connectors (Yellow)
(Always Required)
Turbo Timer Connector (Red)
(Required when using Turbo-Timer)
Data Link Connector
MAP Connectors
MAP Connectors
Injector Connectors
J u i c e
I n s t r u c t i o n s
Figure 2
i

Advertisement

Table of Contents
loading

Table of Contents