Daikin Skyline IM 777-8 Installation And Maintenance Manual page 16

Outdoor air handler
Table of Contents

Advertisement

Figure 26: Piping Arrangements
Float and
thermostatic trap
5GA or 8GA coils. Note that the
addition of a vacuum breaker to
permit the coil to drain during
shutdown.
5J, 5G, 8J or 8G coils.
5RA, 8RA, or 5SA coils. Installed
IM 777-8 • Skyline Air Handler
Check Valve
Strainer
High Pressure (over 25 psi)
Low Pressure (to 25 psi)
5JA or 8JA coil. Installed in series.
Note that each coil must have a
separate control valve and trap.
16
M
Control valve
modulating
Gate Valve
two position
5TA, 8TA, or 5HA coils. Conden-
sate is lifted to overhead return
main
5RA, 8RA, or 5SA coils. Banked two
high, individual trapping of each coil as
shown is preferred.
I
eChanICal
nsTallaTIon
www.DaikinApplied.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Skyline series

Table of Contents