General Checklist - Alpha-InnoTec SWC – Series Operating Manual

Brine/water compact
Hide thumbs Also See for SWC – Series:
Table of Contents

Advertisement

General checklist

The general checklist is intended as an aid for the installation and assembly personnel. It makes no claim to be exhaustive.
Nevertheless, all items must be checked carefully for compliance.
Heat source air
channels closed and sealed
Weather protection screen installed
Rotary field of fan
Heat source brine / heat source water
Heat source volume flow ¹)
motor protection setting
Rotary field of heat source circulating pump
Heat source filled, air-free and sealed
Brine
frost protection down to
Type of anti-freeze agent (please enter)
Water
Water quality oK ²)
Well units
other heat source
Heat pump
Installation of condensate hose
decoupled from structure
vibration decouplers of heating circuit and
heat source connections mounted
solar heat system
1) checked with specifications
2) Report of water analysis must be submitted.
The heating system is filled and pressure tested; the circulating pumps function properly.
The heat source system is completed, inspected and oK.
The heating circuit, heat source system and circulating pumps have been bled.
All electrical components are connected in accordance with the terminal diagram and applicable
local regulations.
All volume flows and water flow rates have been checked and are oK.
checked on: .............................................................................
by: ...............................................................................................
In Germany the following applies:
outside of Germany the following applies:
Sending the general checklist and the completion report also serves as a request for a technician authorized by the manufacturer to
commission your heat pump.
We reserve the right to modify technical specifications without prior notice.
UK830514/200120
For preparation oF the Completion report For heat pump systems
Heating
yes
volume flow ¹)
yes
Heating system designed for maximum
o.K.
Heating system filled, air-free and sealed
low temperature heating
High temperature heating
o.K.
All heating circuits can be opened
A
forward flow tank
o.K.
Return flow tank
yes
Separating tank
contents
°c
Additional heating
Domestic hot water
with heat pump
Request with thermostat
Request with sensor
yes
volume flow ¹)
yes
Heat exchanger surface
yes
connections sealed
electric
o.K.
Rotary field, power network
yes
protective measures checked
yes
Rotary field of compressor
Return flow sensor mounted
No
yes
outdoor sensor mounted
Signature: ........................................................................................
send this general checklist along with the completed report for heat pump
systems to the factory customer service.
send this general checklist along with the completed report for heat pump
systems to the manufacturer's local service partner.
© Alpha-InnoTec GmbH
o.K.
°c
yes
yes
yes
yes
yes
yes
yes
l
kW
yes
yes
yes
o.K.
yes
clockwise
yes
o.K.
internal
external
No
yes
No
yes
No
yes
No
yes
No
yes
No
yes
43

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SWC – Series and is the answer not in the manual?

Table of Contents