InFocus IN5122 Manual page 37

Hide thumbs Also See for IN5122:
Table of Contents

Advertisement

6. Schedule function limitations
are operating in Smart Stack. If the input port to be changed according to the
Schedule function can be used in Smart Stack, the Schedule will be performed. If
not, it will not be performed.
X *2): This item can be scheduled using Web Control when the projectors are
operating in Smart Stack but will not be performed.
X *3): This item cannot be scheduled using Web Control and will not be performed
when the projectors are operating in Smart Stack.
• If the Schedule is not performed, an error message will be sent in
NOTES
accordance with the conditions set up in Schedule Execution Error on Web
Control.
(Network Guide
• If the Schedule function is set to turn off the power when the projectors are
operating in Smart Stack, both the Main and Sub projectors will be turned off.
• If the Schedule function on the Main projector is set to turn on the power, the
projectors will turn on according to the LAMP MODE setting.
• When both projectors are operating in the DUAL mode and a menu is being
displayed on one of the projectors, the Schedule function for My Image and
Messenger on the other projector will not be performed.
• Power Off in the table refers to turning off the power and entering into standby
mode according to the Smart Stack settings or by pressing the STANDBY/ON
button on the remote control or Main projector's control panel.
• The projectors cannot be turned on by the Schedule function on the Sub
projector. Set it on the Main projector as needed.
• When the Sub projector is turned off according to the ALTERNATE MODE
setting, the Schedule function on the Sub projector to turn off its power will be
performed without error.
(continued)
3. Web Control
35
Schedule function limitations
3.6 Alert
Settings)

Advertisement

Table of Contents
loading

This manual is also suitable for:

In5124

Table of Contents