KVH Industries TracPhone V11 Installation Manual page 40

Hide thumbs Also See for TracPhone V11:
Table of Contents

Advertisement

A
Continued
12. Using an appropriate crimp tool (either the
CT-400/300 or the HX-4 with Y1719 dies),
crimp the ferrule in place (see Figure 84).
Crimp as close to the connector body as
possible.
13. Crimp the ferrule again, but further back
from the connector. However, be careful not
to crimp the cable jacket.
14. Slide the heat shrink sleeve over the
connector body and heat it to compress it into
place (see Figure 85). When you are done, the
heat shrink should extend from the rear of the
connector to the cable jacket. This forms a
weather-tight seal.
15. Using a multimeter or similar device, check
the continuity of the cable.
16. Ensure the center conductor pin measures
between 0.20" and 0.28" (5-7 mm) in length, to
ensure proper engagement with the mating
connector (see Figure 86).
Terminating LMR-400-75 Cable
Figure 84: Crimping the Ferrule onto the Cable
Figure 85: Applying the Heat Shrink Tubing
Figure 86: Proper Center Conductor Pin Length
Center Conductor
1/4" (5-7 mm)
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents