Hoisting and Towing
• Use hoisting sling of sufficient strength. Always use the slings of the same
length when more than one is used.
• Always unload the machine before hoisting.
• Do not use the wire rope when hoisting. It will damage tracks.
3683M-0701-020US
3683M-0701-030E
Transporting
Hoisting
1.
Lift Hooks
Towing
1.
Towing Hook
-65-
Attach hoisting slings to 4 lift hooks located
on the corners of the machine. Hoist the
center of the slings.
Hook the towing belt to towing hook in the
front of the machine.