Summary - GE 90*-30 PLC Series User Manual

Interface between a series 90-30 programmable logic controller (plc) and a lonworks network bus interface module
Hide thumbs Also See for 90*-30 PLC Series:
Table of Contents

Advertisement

Q

Summary

Q-12
.
6
When you have finished configuring the reference map, press E
Configuration view, which will now contain the Foreign Module. (If you want to return to the
detail screen shown in step 4, press F10 — zoom).
7. To save the configuration and return to the Configuration Software menu, press E
After the LBIM configuration, network installation, and PLC configuration have been completed,
you are ready to check the configuration. To do this, power cycle the PLC. When the PLC powers
up, you should observe the following sequence of events:
The PWR indicator on the LBIM lights and remains on.
LBIM performs a self-test, during which IN MSG and OUT MSG indicators will light briefly.
When powerup is complete the SVC indicator should not be flashing. (The SVC indicator
flashes when the LBIM is in an unconfigured state.)
If the IN MSG and OUT MSG indicators flash alternately, perform the following procedure:
.
1
Check for overlaps in the network variable mapping and correct the mapping if
necessary.
.
2
Download the LBIM configuration again.
.
3
Power cycle the module.
Series 90™-30 PLC LONWORKS® Bus Interface Module User's Manual – June 1997