Gator 20.8 Breakaway Installation - Mercury MotorGuide VariMAX Manual

Motorguide varimax
Table of Contents

Advertisement

2. Place the pontoon mount base on the surface of the boat deck. Use
the mount base as a template to mark the location of the mount
holes.
IMPORTANT: Using a larger drill bit, countersink the holes on
fiberglass boats to prevent the gel‑coat from cracking.
3. Drill the mounting holes with a 7 mm (1/4 in.) diameter drill bit.
Remove any debris.
4. Install four stainless steel washers and locking nuts onto the
mounting screws underneath the boat deck. Tighten securely.

Gator 20.8 Breakaway Installation

IMPORTANT: Choose an area on the deck which allows a 7.6 cm
(3 in.) clearance between the column and the bow of the boat for all
motor positions.
MOUNT INSTALLATION
Pontoon mount holes
Gator 20.8 Breakaway
37927
22
37805
eng

Advertisement

Table of Contents
loading

Table of Contents