Section C: Tools Needed For Heater Installation - Monitor M2200 Owner's Manual

Heating systems
Table of Contents

Advertisement

SECTION C
Before installing your heater, be sure to check and comply with local and state building and electrical codes
that may apply to vented heaters in your area. Permanent wiring must be installed by a licensed electrician.
TOOLS NEEDED FOR HEATER INSTALLATION
Check the following charts to be sure you have all the tools required to install your Monitor 2200 Heating System.
STANDARD TOOLS
APPLICATION
Phillips Head Screwdriver
Installation of Heater Parts
Steel Tape Measure
Taking Measurements
Pen or Pencil
Marking Drilling Location
Exterior Caulk
Caulking Between Packing and Wall
Yardstick or Long Straight Edge
Checking Angle of Hole for Flue Pipe
Soapy Water
Lubricating Sleeve Hardware
SPECIAL TOOLS
APPLICATION
Electric Drill
Accommodating Hole Saw and Drill Bit
inch Hole Saw Attachment
Cutting Hole for Flue Pipe
Long
1
A inch Drill Bit
Drilling Pilot Hole Through Wall
Level
Checking Angle of Hole for Flue Pipe and for checking
heater level.
Fig. 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents