Sharing Peak Power Control Information with other DMS'
By sharing the peak power control information with other DMS' ,
several buildings can be controlled using the peak power control.
This setting consists of one master DMS and several slave DMS'
and the information of the master DMS must be set on all slave
DMS' . The default DMS setting is set to master.
Demand Controller
Power Cable
Communication,
point of contact
Master DMS transmits the received Peak Level periodically to
the connected slave DMS' and the slave DMS performs demand
control according to the received Peak Level.
The master/slave setting can be set through the Web and the DMS
with the peak interface module connected must be set to be master.
MIM-Doo_IB_E_25059.indd
11
Power board
Peak I/M
Master
DMS
Sharing of Peak Level
Building A
Slave DMS
Building B
Slave DMS
Building C
Slave DMS
2006-03-21
11
E-
ソタネト 7:34:48