Mitsubishi Heavy Industries SRK25GZ-L1 Handbook page 1058

2000 air conditioning & heat pump machinery handbook
Table of Contents

Advertisement

FDC-HKXR
(c) How to connect piping
1)
Connection to front directions.
a) Remove the front hall blank, pass through he hole the intake gas side, gas side and liquid pipes. and then connect then
to the service valves and the on-site piping. (Because the liquid side pipe is on-site piping, bend it to the dimensions
shown in the illustration at low.)
2)
Connection to lower direction.
a) Cut off the accessory intake gas side connection pipe and then connect to the intake gas side atraight pipe.
b) Remove the back hall blank, pass through the hole the intake gas side, discharge gas side, and liquid pipes, and then
connect them to the operation valve and the on-site piping. (Because the liquid side pipe is on-site piping, bend it to the
dimensions shown in the illustration at left.)
1056
62 65
88
145
187
Intake gas side
(Accessory)
62
65
80
Gas side
connection pipe
(Accessory)
Intake gas side
connection pipe
(Accessory)
40
105
107 100
80
80
Liquid pipe
(On-site piping)
Back
Half-brank

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents