Operating Instructions; General Instructions - andrews ECOflo EC230/600 Installation Manual, Operation And Maintenance Manual

High efficiency condensing storage water heaters for natural gas and propane (lpg)
Hide thumbs Also See for ECOflo EC230/600:
Table of Contents

Advertisement

36
SECTION 5 • OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS

Water heaters are heat-producing appliances. To avoid damage or injury, there must be no materials stored against
the water heater or flue system and proper care must be taken to avoid unnecessary contact (especially by children)
with the water heater and flue system. UNDER NO CIRCUMSTANCES SHOULD FLAMMABLE MATERIALS, SUCH
AS GASOLINE OR PAINT THINNER BE USED OR STORED IN THE VICINITY OF THIS WATER HEATER OR IN ANY
LOCATION FROM WHICH FUMES COULD REACH THE WATER HEATER.
Installation or service of this water heater requires ability equivalent to that of a licensed tradesman in the field
involved. Plumbing, air supply, flueing, gas supply and electrical work are required.
Light the unit in accordance with the operating instructions label attached to the water heater.
Under no circumstances should the input rate exceed the input rate shown on the water heater rating plate. Over
firing could result in damage or sooting of the water heater.
If the unit is exposed to the following, do not operate water heater until all corrective steps have been made by a
factory authorized, independent service contractor or qualified service professional.
1. Flooding to or above the level of the burner controls
2. External firing
3. Damage
4. Firing without water
5. Sooting
NEVER OPERATE THE WATER HEATER WITHOUT FIRST BEING CERTAIN IT IS FILLED WITH WATER AND A
TEMPERATURE AND PRESSURE RELIEF VALVE IS INSTALLED IN THE RELIEF VALVE OPENING OF THE
WATER HEATER (UNVENTED INSTALLATIONS ONLY).

GENERAL INSTRUCTIONS

TO FILL THE WATER HEATER
1. Close the water heater drain valve by turning the knob
or valve stem clockwise. If alternative water
connections are provided but not used, make certain
they are plugged (i.e. side connections).
2. Open the cold water supply shut-off valve.
3. Open several hot water taps to allow air to escape
from the system.
4. When a steady stream of water flows from the taps,
the water heater is filled. Close the taps and check for
water leaks at the water heater drain valve,
combination temperature and pressure relief valve and
the hot and cold water connections.
WARNING
SEQUENCE OF OPERATION
1. A call for heat from thermostat
2. Blower ON
3. Pressure switch contacts closed (no exhaust pipe
4. Blower pre-purge
5. Igniter warm-up
6. Main burner ON
7. Flame signal confirmed
8. Thermostat satisfied
9. Main burner OFF
10. Blower post-purge
blockage)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents