Maintenance/Service; Introduction; Pre-Service Operations; Annually - andrews ECOflo EC230/600 Installation Manual, Operation And Maintenance Manual

High efficiency condensing storage water heaters for natural gas and propane (lpg)
Hide thumbs Also See for ECOflo EC230/600:
Table of Contents

Advertisement

MAINTENANCE / SERVICE

INTRODUCTION

Servicing must be carried out by a properly qualified
person.
Whilst giving these instructions for the care of the ECOflo,
it is recommended that checks are carried out by the
installer or local gas service engineer at least annually.
Ensure good ventilation by keeping the heater free of
extraneous materials and clear of dust and lint. Keep
pipework, flue and tops of heaters clear of any
combustible materials. A water softener or scale inhibitor
should be employed in hard water areas. The heater
should be inspected every few months via the hand hole
cleanout and scale or silt deposits removed. Failure to do
so will shorten heater life and may invalidate the warranty.

PRE-SERVICE OPERATIONS

Before servicing, carry out the following operations.
1) Turn off the gas service cock.
2) Turn off the cold water supply to the heater.
3) Turn on the hot water draw-off taps served by the
water heater, or, for multiple installations, turn off the
hot water outlet connection valve and secondary
return valve.
4) Drain down using the drain valve on the heater.

MAINTENANCE SCHEDULE

Following are the instructions for performing some of the recommended maintenance.
Unit inspection and adjustment should be performed by a competent qualified engineer.
COMPONENT
Tank
Relief Valve
Exhaust & Air Intake System
Ignition System
Flue Vent Terminal
Flue Terminal –
Horizontal or Vertical
Combustion System
Condensate Waste Pipe
CORREX POWERED ANODES
As Correx Powered Anodes are fitted as standard to this appliance, no maintenance is necessary.

ANNUALLY

Annual checks of the ignition systems, temperature
controls and any other controls are necessary to ensure
continued safe and efficient operation.
The entire combustion system must be sealed for this
water heater to function correctly. Ensure that the burner
access panel is kept tightly sealed. The combustion air
supply tee piece at the side of the heater must be tightly
clamped to the elbow and concentric flue adaptor.
Replace any damaged parts.
The entire exhaust flue system and combustion air supply
must be inspected at least annually for integrity of all
joints and gaskets.
GENERAL
KEEP APPLIANCE AREA CLEAR AND FREE FROM
COMBUSTIBLE MATERIALS, PETROL AND OTHER
FLAMMABLE VAPOURS AND LIQUIDS.
Water heater maintenance includes periodic tank flushing
and cleaning, and removal of lime scale. The unit should
be inspected and adjusted to maintain proper
combustion. Refer to Fig. 17 below, "Suggested
Maintenance Schedule". A periodic inspection of the flue
installation system should be made.
OPERATION
Sediment Removal
Check Operation
Inspect
Inspect
Clean Inlet Screen
Free of Shrubs
& Debris
Inspect
Inspect
MAINTENANCE / SERVICE • SECTION 6
INTERVAL
Every 6 months
Every 6 months
Every 3 months
Joints should be sealed
Annually
As Required
Monthly
Monthly
Monthly
39
REQUIRED
Flushing
Proper Operation
Clean off dust and dirt
Soft Brush
Remove object
that caused restriction
Confirm S-OP
Remove restriction

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents