Roof Penetration; Manufactured Home Installation - Heatilator C40 Installation Manual

Installation and fireplace setup epa certified woodburning fireplace
Hide thumbs Also See for C40:
Table of Contents

Advertisement

G. Roof Penetration
Refer to Figure 6.10.
Plumb from roof to center of chimney.
Drive a nail up through roof to mark center of pipe.
Measure to either side of nail and mark the 14-1/2 in. x
14-1/2 in. (368 mm x 368 mm) opening required.
Measure opening on the horizontal; actual length may
be larger depending on roof pitch.
Cut out and frame opening.
Refer to Chapter 25 of the Uniform Building Code for
roof framing details.
Install Flashing
Assemble chimney so it passes through the framed
opening.
Slip the fl ashing over the chimney.
NOTICE:
Roofi ng shingles must be below the fl ashing
plate on the lower side of a sloped roof and over the
fl ashing plate on the sides and top.
Nail the fl ashing to the roof. Keep gaps between the
fl ashing plate and the roof to a minimum.
Caulk the fl ashing plate and roof junction as well as
the vertical seam on the fl ashing. All nail heads must
be caulked with a roofi ng sealant.
• Caulk the overlap seam of any exposed pipe sections
that are located above the roof line to prevent leaks.
H. Manufactured Home Installation
SL-300 Series Ceiling/Roof Thimble
NOTICE:
REQUIRED for manufactured homes.
Locate the point where the chimney will exit the roof by
plumbing down to the center of the chimney. Lay out,
cut and frame a 14-1/2 in. (368 mm) square opening
(measured on the horizontal) through the ceiling and roof
structure. Consult local codes for framing details.
The thimble must extend completely through the roof
structure shielding combustible materials. Five location
holes have been provided to allow for a variety of ceiling/
roof thicknesses. A thimble extension is required when
the ceiling/roof thickness exceeds 12-1/2 in. (318 mm).
The extension should overlap the thimble one inch.
To attach the extension to the thimble, drill 1/8 in. (3 mm)
holes through the outer shield of the thimble using the
predrilled holes in the extension as guides. Attach the
extension to the thimble using the screws provided with
the extension.
Install the thimble assembly and nail it securely to the
framing members.
30
Heatilator • C40 Constitution • 480-2340 Installation Manual • Rev B 01-29-13
Figure 6.10 Ceiling/Attic Construction
Center the fl ashing over the chimney and nail it to the
roof using the Stormguard nails provided. Keep gaps
between the fl ashing plate and the roof to a minimum.
Caulk the fl ashing plate and roof junction as well as the
vertical seam on the fl ashing. All nail heads must be
caulked with a roofi ng sealant.
Finish assembling the chimney storm collar and
termination cap following the installation instructions
provided with them.
FLASHING
Figure 6.11 Installing Part: 12966A, Confi guration 1
CHIMNEY
FLASHING
PLATE
JOISTS
NAIL
THIMBLE

Advertisement

Table of Contents
loading

Table of Contents