Goring Kerr manufactures various types of metal detectors and metal detector systems . This manual illustrates the installation
requirements of the most common configuration, the belt conveyor system. However, the methods shown within this manual
apply to all of the systems Goring Kerr manufactures. This manual is also available in a Windows Help format. Contact Goring
Kerr on how to receive a your copy.
Model 402 Gravity Feed System
Model 402
The model 402 system is supplied completely assembled and tested from the factory. The system
you have may vary from that shown here. Four mounting holes are located at the top of the frame to
support this system. The typical mounting method is to suspend the system with threaded rod. The
threaded rod should support the complete load of the system. When securing the threaded rod to
the 402 frame isolation bushings should be used on all four mounting holes. This will electrically
isolate the frame from any support structure. The 402 system is not designed to support piping from
any of the ports. Piping connected to any of the ports should be independently supported. Hanging
piping from the reject value may distort the valve body and cause unreliable rejection.
( See manual NA-DSP2/GRAV )
Figure 3
Model 426 Pipeline System
Model 426
The model 426 pipeline system is supplied completely assembled and tested from the
factory. Four mounting holes are located in the corners of the support frame. The typical
mounting method is to suspend the system with threaded rod. The threaded rod should
support the complete load of the system. When securing the threaded rod to the 426
frame isolation bushings should be used on all four mounting holes. This will electrically
isolate the frame from any support structure. Any pipes connected to the system should
be independently supported and not supported by the metal detector system.
( See manual NA-DSP2/PIPE )
Figure 4
Model T7 Pharmaceutical System
The model T7 pharmaceutical system is supplied completely assembled and tested
from the factory. The system is ready to use right from the crate. The reject device,
control unit and search head are pre-wired. The mains supply power cord is also pre-
wired.
( See manual NA-DSP2/PHARM )